Courtesy of a surface owner

Previous - Slide  6 - Next

Once the well goes into production, “gathering” pipelines are needed to take the gas from the well to compressor stations.  This photo shows the laying of a gathering line.  In addition, much larger transmission lines (not pictured) are needed take the gas on to market.

 

Go directly to intro or slide: 1  2  3  4  5  5a  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  21A  22  23  24  25  26  27  28  29