Underground Injection Control (“UIC”) Permitting

Underground Injection Control (“UIC”) Permitting

The driller is not supposed to inject fluids (other than drilling and fracing fluids necessary to drill the well) into a well without getting a permit from the State.  Below is the State’s materials regarding the permitting of UIC wells.  Some of the later pages are more explanatory than the earlier pages.

May 28 2025  Leasing / Amendment Advice
Diversified gets well plugging shortcut through 2025 Legislature (people signing new leases/amendments should disallow shortcut).
Nov 30 2023  Newsletter
Surface Owners’ News – 2023 Annual Print Edition
Nov 15 2023  Leasing / Amendment Advice
What is a “Division Order”? 
Feb 7 2023  Updates and Alerts
Surface Owners say DEP needs at least 45, not just 23, oil and gas inspectors.
Share via
Share via
Send this to a friend