Underground Injection Control (“UIC”) Permitting

Underground Injection Control (“UIC”) Permitting

The driller is not supposed to inject fluids (other than drilling and fracing fluids necessary to drill the well) into a well without getting a permit from the State.  Below is the State’s materials regarding the permitting of UIC wells.  Some of the later pages are more explanatory than the earlier pages.

Mar 2 2026  Updates and Alerts
Take Action to Stop Forced Subsidence
Mar 2 2026  Misc Gallery
Longwall Mining Subsidence Damage
Jan 22 2026  News
Updated Royalty Advice for Leasing and Lease Amendments
Jan 22 2026  News
WV SORO and Allies Sue Over WV DEP Carbon Capture Oversight
Share via
Share via
Send this to a friend